Mesin injection blow molding

Panduan Penyesuaian Tekanan Tiup: Pengaturan Optimal untuk Berbagai Bahan Plastik

Daftar Isi

Mengapa Tekanan Tiup Adalah Suatu Sistem, Bukan Satu Angka

Aibim, a Wanplas factory based in Zhangjiagang, has manufactured injection (stretch) blow molding machines for more than 12 years, with 20 years of accumulated know-how in the injection blow molding field. Our lines serve customers in over 40 countries, run from our own CNC machining center, and produce more than 100 lines per year from a new factory established in 2022. Container sizes span from 3 ml medical droppers to 1000 ml cosmetic and food bottles. The single most misunderstood parameter among new operators is blow pressure. Many buyers ask for “the right blow pressure” as if it were one number printed on a dial. In reality, blow pressure is a system. It is the combination of a low-pressure preblow stage and a high-pressure final blow stage, multiplied by timing, material behavior, parison or preform temperature, mold temperature, and bottle geometry.

This guide explains blow pressure as a controllable process window rather than a fixed setpoint. We cover the physics of gas pressure pushing molten polymer against a cold mold cavity, the two-stage pressure architecture used on Aibim three-station one-step IBM machines, how pressure interacts with temperature and timing, and a full material-by-material table of optimal pressure windows. Whether you run PET, PP, PE, PS, SAN, PC, ABS, or TPU, the methodology below lets you move from a generic starting point to a verified, repeatable pressure recipe stored on the machine’s SD card.

Key Statistics
– Aibim: 12+ years of machine manufacturing, 20 years in injection blow molding know-how
– Exported to 40+ countries; 100+ lines per year capacity
– Container range 3 ml to 1000 ml; three-station one-step IBM process
– PREFILL hydraulic technology saves a minimum of 35% energy versus conventional hydraulic lines
– CE certified with light curtain and laser sensor safety systems

Fisika Tekanan Tiup dalam Pembentukan Botol

Blow pressure exists for one physical purpose: to drive the molten polymer of the parison or preform outward until it contacts every surface of the blow mold cavity, then to hold it there while it freezes and takes the final shape. In injection blow molding the parison is injected as a tubular blank at the first station, transferred to the blow station, and expanded by compressed air. The air pressure does mechanical work against the polymer’s viscosity and against the heat-transfer rate of the mold wall.

When blow pressure is too low, the polymer cannot overcome its own viscosity and the mold’s cooling effect before it solidifies. The result is poor mold contact, shallow detail, thick-and-thin wall distribution, and weak structural zones. When blow pressure is too high, the polymer is forced into a thin, over-stretched skin that loses mechanical strength, develops internal stress, risks burst during the cycle, accelerates mold wear, and wastes compressed-air energy. The correct pressure is therefore a balance point where the material fully contacts the cavity with the minimum air energy required.

Air pressure also interacts with the rate of pressure rise. A steep, instant step from zero to maximum pressure can trap the material unevenly and create localized stress marks, while a controlled ramp that begins with a gentle preblow and rises to final blow gives the material time to distribute before it sets. This is why a two-stage system outperforms a single fixed pressure for bottles with non-uniform geometry.

The pressure required to move the polymer is a function of its extensional viscosity at the moment of blowing. A polymer that is still hot and soft extends at low pressure; the same polymer a few seconds later, after the mold has pulled heat from its surface, may need double the pressure to move the same distance and will instead tear or thin. This is the central reason blow pressure cannot be set without also controlling temperature and time. The operator is, in effect, racing the freeze front: pressure must arrive while the material is still mobile enough to flow, but not so early or so hard that it stretches the wrong zone.

Another physical factor is the surface area the air must push against. As the bubble grows, its internal volume rises with the cube of the radius while the wall area rises with the square, so the local stress in the wall drops as the bottle expands, provided the material keeps thinning evenly. If the pressure is too low, the bubble stalls before it reaches the cavity corners and the wall freezes in a thick, uneven state. If the pressure is too high, the bubble reaches the wall so fast that the material has no time to redistribute, producing a thin spot opposite the injection point and a thick ring near the neck. Reading the wall-thickness profile after a trial shot tells you far more about the correct pressure than the pressure gauge alone.

Sistem Tekanan Dua Tahap: Tiup Awal dan Tiup Akhir

Pada mesin IBM Aibim, sirkuit pneumatik dibagi menjadi dua tahap yang terkendali. Memahami peran setiap tahap adalah dasar penyetelan yang benar.

Tekanan Pra-Tiup (Tahap Tekanan Rendah)

The preblow stage applies a low air pressure the moment the parison or preform enters the blow mold. Its job is to begin the expansion, establish the initial bubble shape, and guide where the material will go before the high pressure arrives. Preblow pressure and preblow timing together decide the wall-thickness distribution more than any other single variable. If the preblow is too weak or arrives too late, the material collapses onto the mold base before it has spread upward, leaving a thick bottom and a thin shoulder. If the preblow is too strong or arrives too early, the material stretches prematurely and thins in the zone that still needs material later.

Jendela preblow khas per material dirinci dalam tabel material di bawah ini, tetapi sebagai konsep, preblow untuk material berorientasi seperti PET atau PCTG sering berada sekitar 8 hingga 16 bar, sedangkan material lunak seperti LDPE atau TPU berada lebih dekat ke 4 hingga 9 bar.

Tekanan Tiup Akhir (Tahap Tekanan Tinggi)

The final blow stage applies the high pressure that completes cavity contact, forms fine detail such as embossing or threads, and sets the bottle dimensions. Final blow pressure is held for a defined dwell, then vented. For PET the final blow commonly ranges 25 to 40 bar; for PP, PE, PS, and PC the windows differ and are listed per material. After the high-pressure dwell, a short exhaust and cooling phase lets the part solidify enough for transfer to the ejection station.

Perbedaan Injeksi Peniupan

In IBM the parison is injection-molded with precise wall distribution, then blown in a separate station on the same machine. Compared with extrusion blow molding, where the parison is extruded and hotter with more sag, IBM parisons are cooler and more controlled, so the blow pressure requirement is steadier and the scrap rate lower. Compared with two-step stretch blow molding of PET, IBM performs the blow on a preform that was just injected rather than re-heated, which removes the reheat oven variable but still requires correct blow pressure and timing for full orientation.

Bagaimana Tekanan Tiup Berpasangan dengan Suhu, Waktu, dan Cetakan

Tekanan tiup tidak pernah disetel secara terpisah. Ia termasuk dalam segitiga tekanan, suhu, dan waktu. Mengubah satu sisi memaksa perubahan pada sisi lainnya.

  • Kopling suhu: Parison atau preform yang lebih hangat mengalir pada tekanan yang lebih rendah. Jika Anda menaikkan suhu laras atau cetakan, Anda sering dapat menurunkan tekanan tiup dan tetap mendapatkan kontak penuh. Bagian yang lebih dingin membutuhkan tekanan lebih, tetapi menekan terlalu banyak tekanan pada material dingin menciptakan tegangan dan risiko ledakan.
  • Kopling waktu: Penundaan preblow dan waktu tahan tiup akhir adalah tuas waktu. Preblow yang tertunda menggeser material ke bawah; waktu tahan akhir yang lebih lama meningkatkan detail tetapi memperpanjang siklus dan penggunaan energi.
  • Kopling suhu cetakan: Suhu cetakan mengontrol laju pembekuan. Cetakan dingin memungkinkan Anda menggunakan tekanan lebih tinggi untuk detail yang tajam tetapi berisiko tegangan; cetakan hangat untuk material yang dapat mengkristal seperti PP mengontrol kristalisasi namun memerlukan tekanan yang disesuaikan untuk menghindari kendur.
  • Kopling gaya penjepit: Tekanan tiup bekerja melawan permukaan rongga bagian dalam. Gaya penjepit yang memadai mencegah flash pada garis pemisah. Menaikkan tekanan tiup tanpa gaya penjepit yang cukup menghasilkan flash, bukan botol yang lebih baik.

Aturan praktis: setel jendela suhu terlebih dahulu, lalu preblow untuk mengatur distribusi, kemudian tiup akhir untuk kontak, lalu sesuaikan waktu. Jangan pernah mengejar cacat hanya dengan mengubah angka tekanan sambil mengabaikan suhu dan waktu.

Desain Dinding Parison dan Pengaruhnya pada Tekanan Tiup

In injection blow molding the parison is not a neutral tube; its wall thickness profile is set at the injection station and directly determines how much blow pressure is needed and where. A parison with a heavier base and lighter shoulder will need less final blow pressure at the bottom and more at the top. A parison with uniform wall needs a more uniform pressure ramp. Because the parison wall is programmable through the injection and core-rod design, the blow pressure window is really the second half of a two-part control system: injection sets the material budget, blow pressure spends it.

This coupling means a pressure problem is sometimes solved at the injection end rather than the blow end. If a bottle consistently shows a thin shoulder regardless of final blow pressure, the parison is likely too light at the shoulder and no amount of air will move material that is not there. Adding parison weight at that zone, or shifting the core-rod program, reduces the required blow pressure and improves the result. Conversely, an over-heavy parison forces you to raise pressure merely to spread excess material, which wastes energy and stresses the mold. Treating parison design and blow pressure as one loop is the fastest route to a stable recipe.

Interaksi Batang Peregang

On machines that include a stretch step, the stretch rod physically lengthens the preform before the air arrives. The rod sets the axial orientation; the blow pressure sets the radial orientation. If the rod moves too far before the preblow, the material is already thin axially and the final blow will over-thin the side wall. If the rod moves too late, the preblow alone must do the axial work and will need a higher pressure than the material tolerates. The pressure recipe therefore includes the stretch rod speed and start point as hidden variables, especially for PET and PCTG where biaxial orientation defines quality.

Pengaturan Tekanan Tiup Optimal Berdasarkan Material

The table below gives engineering windows for each material processed on Aibim IBM machines. These are typical starting ranges, not guaranteed setpoints; always verify on the actual mold and material grade, and store the confirmed recipe on the SD card. Process temperature is the melt temperature in the barrel; mold temperature is the blow cavity temperature; hold time is the final-blow dwell.

Read the table as a band, not a point. Within each band, the correct value depends on wall thickness, bottle size, and cavity count. A thicker-wall bottle sits at the lower edge of the final-blow band because the material has more mass to push but less distance to travel; a thin-wall large bottle sits higher because the air must drive a light shell fully into a large cavity before it freezes. When moving between grades of the same polymer, raise the pressure slightly for higher molecular weight or higher filler content, and lower it for easier-flow grades. The per-material notes that follow explain the behavior behind each band so you can reason about adjustments instead of guessing.

Material Process Temp (°C) Preblow (bar) Final Blow (bar) Hold Time (s) Mold Temp (°C) Typical Defect Linkage
PET 260–285 8–16 25–40 1.5–3.0 10–25 Low orientation if preblow weak; haze if over-pressured
PCTG 255–280 8–15 24–38 2.0–3.5 20–40 Stress marks if cooled too fast
PP (clarified) 220–260 6–12 20–34 2.0–4.0 20–60 White stress marks if pressure ramps too fast
HDPE 200–230 5–10 16–30 2.0–4.0 10–40 Softness; needs good cooling before eject
LDPE / LLDPE 180–220 4–9 14–26 2.0–4.0 10–40 Low rebound; risk of sticking
PS 200–240 6–12 18–30 1.5–3.0 20–50 Brittle; bursts if final blow too high
SAN 210–250 7–13 20–32 2.0–3.5 40–70 Needs warm mold for gloss; sensitive to over-pressure
PC 280–320 10–18 30–45 3.0–6.0 80–120 High dry requirement; stress cracks if over-pressured
ABS 210–250 7–13 22–36 2.5–4.5 50–80 Opaque; tolerant, medium pressure
TPU 190–230 4–9 14–26 3.0–6.0 20–60 Soft elastic; sticking and rebound control needed

PET dan PCTG

PET and PCTG are orientation-sensitive. PET must be dried below about 50 ppm moisture before processing, and the preblow establishes the biaxial orientation that gives the bottle its strength and clarity. A weak preblow leaves the material un-oriented and cloudy; a correct preblow followed by a 25–40 bar final blow gives a clear, strong bottle. PCTG is less moisture-sensitive than PET but still benefits from a controlled ramp; over-pressure on a fast-cooling cavity produces stress whitening rather than crisp detail.

PP

PP is crystallizable and temperature-sensitive. Clarified PP for transparent bottles needs a warm enough mold to control crystallization, yet too warm a mold causes sag that must be countered by adjusting pressure timing rather than by raising pressure blindly. A gentle pressure ramp reduces the white stress marks common in PP. The window of 6–12 bar preblow and 20–34 bar final blow suits most PP bottles.

PE (HDPE, LDPE, LLDPE)

Polyethylene is soft and has low rebound, so it needs relatively low blow pressure. HDPE suits 16–30 bar final blow; LDPE and LLDPE need even less because they are more flexible and tend to stick to the cavity. Cooling and demolding control matter more than raw pressure for PE. Over-pressuring PE wastes air and can flash at the parting line without improving the bottle.

PS dan SAN

PS is intrinsically transparent but brittle. Final blow above the material’s comfort band causes burst or micro-cracks. A gentle, well-timed pressure rise is essential. SAN is similar but more chemical-resistant and glossy; it wants a warmer mold (40–70 °C) for surface gloss and a moderate pressure that does not over-stress the part.

PC

PC has high viscosity and demands high drying (below about 50 ppm) plus high process temperature (280–320 °C) and a warm mold (80–120 °C) to avoid stress. Blow pressure is among the highest of the common materials, 30–45 bar final, but the pressure must rise smoothly to avoid internal stress cracking. PC bottles are usually for medical or reusable drinkware where dimensional stability is critical.

ABS

ABS bersifat buram, tangguh, dan toleran. Tekanan sedang (tiup akhir 22–36 bar) sudah cukup. ABS dipilih untuk stoples kosmetik dan perawatan pribadi di mana warna dan hasil akhir permukaan lebih penting daripada kejernihan. Tidak diperlukan pengeringan khusus selain pengeringan normal, dan cetakan dapat dijalankan hangat untuk permukaan yang baik.

TPU

TPU bersifat lunak dan elastis. TPU membutuhkan tekanan rendah (tiup akhir 14–26 bar) dan pembongkaran cetakan yang hati-hati karena memori elastis dapat menyebabkan lengket dan pantulan. Waktu tahan dan pendinginan yang lebih lama sebelum ejeksi mengurangi deformasi. Botol TPU muncul dalam aplikasi medis khusus dan kosmetik soft-touch.

Koreksi Tekanan Berdasarkan Bentuk Botol dan Ketebalan Dinding

Resep tekanan yang berhasil untuk botol bulat 100 ml mungkin gagal pada botol asimetris 750 ml dengan pegangan. Tabel di bawah ini memberikan aturan koreksi yang Anda terapkan di atas jendela dasar material.

Bottle Type Preblow Correction Final Blow Correction Timing Note
Thin wall (≤ 0.4 mm) Slightly higher to avoid early contact High, for full cavity contact Shorten high-pressure dwell to limit thinning
Thick wall (≥ 1.2 mm) Lower and later Extend dwell and hold Longer hold for complete freeze
Large volume (> 500 ml) Lower, delayed preblow Extend final dwell Manage cooling, watch cycle time
Small volume (< 50 ml) Higher preblow Moderate final Fast cycle, short dwell
Handle or asymmetric Zone-balanced Higher at fill stage for handle Delay to fill recessed zones
Wide mouth Lower preblow Moderate final Watch neck finish
Narrow neck Moderate Ensure base fills first Confirm base before neck pressure

Metodologi Penyetelan Tekanan Langkah demi Langkah

Gunakan alur keputusan berikut setiap kali Anda memulai material baru, cetakan baru, atau ukuran botol baru. Alur ini menjaga tekanan, suhu, dan waktu dalam urutan yang benar.

>
Step Action Set / Adjust Verify
1 Fix material temperature window Barrel and mold temp per material table Melt flows, no degradation
2 Set preblow to form bubble Preblow bar and delay per material Even early expansion, no collapse
3 Set final blow for contact Final blow bar and ramp rate Full cavity contact, detail formed
4 Fine-tune timing Preblow delay, final dwell, exhaust Wall distribution balanced
5 Validate the part Measure wall, volume, burst, top load Within spec; no stress marks
6 Save and reuse Store recipe on SD card Same recipe runs on sister machines

Mulai dari ujung bawah jendela tiup akhir dan naikkan hanya hingga kontak rongga penuh tercapai. Setiap kenaikan di atas minimum adalah energi udara bertekanan yang terbuang. Dokumentasikan angka yang diterima sehingga resep dapat dimuat ulang pada IBM65 atau IBM75 lain tanpa penyetelan ulang dari nol.

Cacat Terkait Tekanan: Referensi Cepat Gejala dan Penyesuaian

Tabel berikut memetakan cacat tiup umum ke arah penyesuaian yang terkait tekanan. Anggap sebagai kartu respons pertama; selalu konfirmasi dengan pemeriksaan suhu dan waktu.

# Symptom Likely Pressure Cause Adjustment Direction
1Poor mold contact / incomplete formingFinal blow too low or delayedRaise final blow; check preblow timing
2Thin wall in shoulder or sidePreblow too early/strong, uneven parisonLower or delay preblow; adjust parison temp
3Thick wall / material pooling at basePreblow too late, final too lowAdvance preblow; raise final blow
4Bottle burst during cycleFinal blow too high or ramp too steepLower final blow; soften ramp
5White stress marks (PP/PE)Pressure ramp too fast, cold materialReduce pressure rate; raise temp
6Flash at parting lineFinal blow exceeds clamping forceLower final blow; verify clamping force
7Neck or finish deformationLocal over-pressure at neckReduce blow at neck; check mold temp
8Unstable base / rockingPreblow timing wrong, base not setAdjust preblow timing; lower final slightly
9Poor detail / embossing unclearFinal blow too low or dwell shortRaise final blow; extend dwell
10Internal stress cracking (PC/PS)Over-pressure, fast coolingLower pressure; raise mold temp; anneal
11Ovality / distortion after ejectPressure-cooling imbalanceBalance pressure with cooling time
12Weld line at handleInsufficient fill-stage pressureRaise final at handle stage; adjust parison
13Surface haze from over-pressureFinal blow too high for materialReduce final blow
14Short shot / incomplete fillAir volume or final blow insufficientRaise final blow; check air supply volume
15Pinch-off too thin / leakClamping and pressure mismatchVerify clamping; tune pressure
16Residual pressure trapExhaust timing too lateAdvance exhaust; check valve

Kesalahan Umum Pengaturan Tekanan

Bahkan operator berpengalaman pun mengulangi beberapa kesalahan yang dirancang untuk dicegah oleh metode di atas. Mengenali kesalahan tersebut memperpendek waktu penyetelan.

  • Menyetel tekanan sebelum suhu: Dengan suhu laras atau cetakan yang salah, angka tekanan apa pun tidak bermakna. Perbaiki suhu terlebih dahulu.
  • Mengejar satu cacat dengan tekanan lebih: Bahu yang tipis jarang diperbaiki dengan menaikkan tiup akhir; ia diperbaiki dengan berat parison atau waktu preblow. Tekanan yang lebih tinggi hanya memindahkan masalah ke tempat lain.
  • Menggunakan satu resep untuk berbagai material: PET dan PP tidak dapat dipertukarkan; resep harus berubah sesuai dengan grade resin.
  • Mengabaikan laju ramp: Angka puncak kurang penting dibandingkan seberapa cepat ia tercapai. Ramp yang lembut mencegah ledakan dan bekas tegangan.
  • Tidak menyimpan resep: Resep yang telah terverifikasi di kartu SD menjadi pengetahuan yang hilang jika tidak disimpan dan diberi label berdasarkan material dan botol.
  • Tekanan berlebih untuk margin keamanan: Margin tekanan 20% di atas minimum jarang membantu dan selalu membuang udara serta mengauskan cetakan.

Sistem Pneumatik dan Efisiensi Energi

Compressed air is one of the largest hidden costs in blow molding. Aibim machines use PREFILL technology and a variable displacement pump pressurizing system in the hydraulic circuit, and a staged high-low pressure air system for the blow function. The energy-saving design reduces consumption by a minimum of 35% compared with conventional hydraulic lines.

Air quality matters. For food, pharmaceutical, and cosmetic bottles the compressed air should be oil-free and dried to a clean class consistent with ISO 8573-1 concepts (oil, water, and particle limits). Contaminated air leaves odors or particles in the bottle and can foul valves. A staged supply separates the low-pressure preblow line from the high-pressure final-blow line so the compressor does not run everything at maximum pressure.

Air recovery, where practical, captures vented blow air or recovers expansion energy, lowering the effective energy per bottle. Even without full recovery, right-sizing the receiver, stabilizing line pressure, and only using the minimum final blow needed already cut air cost substantially. The table below compares energy and air indices using a baseline of 100 index points.

Configuration Air Energy Index Relative Cost vs Baseline
Conventional fixed pump, single pressure135High1.35× baseline
Staged high-low air, no recovery110Medium1.10× baseline
Aibim PREFILL + variable pump + staged air65Low0.65× baseline (35% saved)
Above with air recovery add-on52Low0.52× baseline

Keselamatan Sistem Udara Bertekanan Tinggi

Tekanan tiup akhir mencapai 25–45 bar, dan sistem udara bertekanan membawa bahaya nyata. Mesin Aibim bersertifikat CE dan mencakup tirai cahaya untuk keselamatan personel serta sensor laser digital jarak jauh di stasiun stripper untuk keselamatan cetakan. Aturan keselamatan untuk sirkuit pneumatik meliputi:

  • Jangan pernah membuka saluran bertekanan; turunkan tekanan dan kunci sebelum perawatan.
  • Pasang dan uji katup pelepas tekanan pada receiver dan sirkuit tekanan tinggi.
  • Lindungi stasiun tiup dari pecahan akibat ledakan; tirai cahaya menghentikan siklus jika pelindung dibuka.
  • Periksa selang, katup, dan fitting secara terjadwal; ganti sesuai rencana perawatan.
  • Latih operator tentang penghentian darurat dan arti alarm tekanan.

Metode Verifikasi Kualitas

Resep tekanan hanya sebaik verifikasi yang mendukungnya. Untuk setiap resep baru atau perubahan material, lakukan pemeriksaan berikut:

  • Ketebalan dinding per zona: Ukur dasar, badan, bahu, dan leher dengan pengukur ketebalan; pastikan distribusinya sesuai dengan desain.
  • Volume: Isi untuk memastikan botol memenuhi kapasitas yang dinyatakan.
  • Beban atas: Terapkan beban vertikal untuk memastikan kekuatan susun.
  • Tekanan pecah: Beri tekanan hingga gagal untuk memastikan margin aman di atas tekanan pengisian.
  • Penampilan: Periksa bekas tegangan, kabut, flash, dan kejelasan detail.
  • Pengambilan sampel produk pertama dan per batch: Kualifikasi penuh produk pertama, lalu ambil sampel pada interval yang ditetapkan selama proses berjalan.

Biaya Relatif dan Profil Energi

Biaya untuk memproduksi sebuah botol didominasi oleh material, energi, dan skrap. Tabel di bawah ini menilai tingkat biaya dan energi khas per material pada lini IBM Aibim. Penilaian menggunakan band Rendah, Sedang, Tinggi, Sangat Tinggi, dan Premium dengan poin indeks yang mengacu pada garis dasar 100.

Material Material Cost Band Energy Index Air Cost Band Process Difficulty
HDPE / LDPELow90LowLow
PPLow95LowMedium
PSMedium100MediumMedium
ABSMedium105MediumLow
SANMedium108MediumMedium
PETMedium110MediumMedium
PCTGHigh112MediumHigh
TPUHigh115HighHigh
PCVery High130HighVery High

Indeks energi relatif terhadap garis dasar 100 poin untuk botol PP standar pada IBM65; PC lebih tinggi karena kebutuhan pengeringan dan cetakan hangat. Tidak satu pun dari angka-angka ini adalah harga pembelian; angka-angka ini hanya menggambarkan biaya operasional relatif.

Mesin Cetak Tiup Injeksi Aibim

Aibim memproduksi tiga seri IBM inti, masing-masing dengan sistem pneumatik terkendali untuk preblow dan tiup akhir. Rentang spesifikasi di bawah ini adalah jendela rekayasa khas; konfirmasi angka pasti terhadap lembar data pabrik untuk cetakan dan material Anda.

Mesin Cetak Tiup Injeksi IBM75

Parameter Typical Range
ModelIBM75
Injection screw diameter (mm)45
Shot size (g)80–150
Clamping force (kN)750
Container volume (ml)50–1000
Stations3 (injection, blow, eject)
Air config (preblow + final blow, bar)6–16 + 20–40
Installed power (kW)25–33
Air consumptionStaged high-low; tuned per recipe
Cycle time (s)10–16

Mesin Cetak Tiup Injeksi IBM65

Parameter Typical Range
ModelIBM65
Injection screw diameter (mm)40
Shot size (g)60–110
Clamping force (kN)650
Container volume (ml)10–500
Stations3 (injection, blow, eject)
Air config (preblow + final blow, bar)6–16 + 20–40
Installed power (kW)18–25
Air consumptionStaged high-low; tuned per recipe
Cycle time (s)9–14

Mesin Cetak Tiup Injeksi Hibrida Elektrik IBM55

Parameter Typical Range
ModelIBM55 Hybrid Electric
Injection screw diameter (mm)35
Shot size (g)40–80
Clamping force (kN)550
Container volume (ml)3–250
Stations3 (injection, blow, eject)
Air config (preblow + final blow, bar)6–14 + 18–36
Installed power (kW)12–18 (hybrid, lower draw)
Air consumptionStaged high-low; tuned per recipe
Cycle time (s)8–13

All three series share the PREFILL hydraulic technology and variable displacement pump pressurizing system, the SD card parameter storage for cross-machine recipe reuse, and the single-crossbeam double-pole clamping framework that enlarges mold setting space. The IBM55 hybrid adds electric servo motion for lower energy draw on small containers.

Industri Aplikasi dan Kesesuaian Material

Mesin IBM Aibim melayani industri farmasi, makanan, minuman, dan kosmetik. Resep tekanan mengikuti isi produk:

  • Farmasi: Botol cairan oral, obat tetes mata, dan diagnostik dari PE, PP, PS, dan PC memerlukan bagian yang bersih dan bebas tegangan; ramp halus bertekanan rendah melindungi permukaan yang bersentuhan dengan obat.
  • Makanan: Botol saus, madu, dan bumbu dari PP dan HDPE memerlukan leher yang kokoh; tekanan disetel untuk integritas segel.
  • Minuman: Botol air dan minuman fungsional dari PET dan PCTG memerlukan orientasi untuk kejernihan dan kekuatan.
  • Kosmetik: Stoples krim dari ABS dan SAN, tube lembut dari TPU, dan stoples bening dari PET atau PCTG memerlukan kilap dan detail permukaan; tekanan disetel untuk kualitas hasil akhir.

Material yang dapat diproses di seluruh jajaran Aibim adalah PE (HDPE, LDPE, LLDPE), PP, PS, ABS, SAN, TPU, PC, dan PCTG.

Panduan Pemilihan: Kebutuhan ke Model

Gunakan tabel ini untuk memetakan kebutuhan ke mesin dan konfigurasi udara. Rentang nilai hanyalah panduan; pemilihan akhir bergantung pada jumlah rongga cetakan dan target keluaran.

Material Container Volume Wall / Output Recommended Model Air Config
PET / PCTG100–1000 mlMedium, high clarityIBM758–16 + 25–40 bar
PP / HDPE50–500 mlMedium, food gradeIBM656–12 + 20–34 bar
PS / SAN10–250 mlThin, glossyIBM55 Hybrid6–13 + 18–32 bar
PC50–500 mlThick, medicalIBM7510–18 + 30–45 bar
ABS10–500 mlMedium, opaqueIBM657–13 + 22–36 bar
TPU3–250 mlSoft, elasticIBM55 Hybrid4–9 + 14–26 bar
Small pharma3–100 mlHigh volumeIBM55 Hybrid6–14 + 18–36 bar

Layanan dan Dukungan

Aibim, as a Wanplas factory, applies the Wanplas group service commitments. Before shipment each machine is test-run and inspected with the customer, CE certified with light curtain and laser sensor safety. Our engineers perform on-site installation and commissioning, and train your operators on pressure tuning and recipe storage.

The Wanplas shared policy provides USD 500 free parts per year and free replacement of damaged parts within the warranty period. Because recipes are stored on an SD card, a verified pressure setting can be carried to a second machine, which makes process transfer and capacity expansion straightforward. We also offer remote operation support, open our factory for customer visits, and guarantee transportation, production capacity, and quality standards.

Pertanyaan yang Sering Diajukan

Apa perbedaan antara tekanan preblow dan tekanan tiup akhir?

Preblow adalah tahap bertekanan rendah yang memulai ekspansi dan mengatur distribusi dinding; tiup akhir adalah tahap bertekanan tinggi yang menyelesaikan kontak rongga dan membentuk detail. Menyetel preblow terlebih dahulu memberikan kontrol atas ketebalan, kemudian tiup akhir mengamankan bentuk.

Bagaimana material memengaruhi tekanan tiup dalam injeksi molding tiup?

Setiap material memiliki viskositas dan laju pembekuan yang berbeda. PE lunak membutuhkan tekanan rendah; PC kaku membutuhkan tekanan tinggi dan cetakan hangat; PS rapuh membutuhkan ramp yang lembut. Tabel material dalam panduan ini memberikan jendela untuk masing-masing.

Bisakah saya menggunakan tekanan tiup yang sama untuk PET dan PP?

Tidak. PET menginginkan preblow yang membangun orientasi dan tiup akhir 25–40 bar, sedangkan PP membutuhkan ramp yang lebih lembut dan suhu cetakan yang mengontrol kristalisasi. Menggunakan resep PET pada PP menyebabkan bekas tegangan; menggunakan resep PP pada PET menghasilkan orientasi yang buruk dan kabut.

Mengapa botol saya pecah bahkan pada tekanan sedang?

Ledakan biasanya berasal dari ramp tekanan yang terlalu curam, material dingin, atau dinding lokal yang tipis akibat waktu preblow yang salah. Turunkan tiup akhir atau lunakkan ramp, naikkan suhu sedikit, dan periksa penundaan preblow sebelum menaikkan tekanan.

Bagaimana cara menyesuaikan tekanan tiup untuk desain botol baru?

Ikuti metode enam langkah: setel suhu terlebih dahulu, setel preblow untuk bentuk gelembung, setel tiup akhir untuk kontak, sesuaikan waktu, validasi dinding dan ledakan, lalu simpan ke kartu SD. Mulai dari ujung bawah jendela tiup akhir dan naikkan hanya hingga kontak penuh.

Apakah tekanan tiup yang lebih tinggi berarti kualitas botol yang lebih baik?

Tidak. Tekanan di atas minimum yang diperlukan untuk kontak hanya membuang udara, meningkatkan keausan cetakan, dan dapat menyebabkan tegangan, ledakan, dan kabut. Tujuannya adalah tekanan terendah yang memberikan kontak rongga yang penuh dan merata.

Bagaimana sistem pneumatik Aibim menghemat energi?

Aibim menggunakan teknologi PREFILL dan pompa perpindahan variabel dalam sirkuit hidraulik ditambah sistem udara tinggi-rendah bertahap untuk tiup. Kombinasi ini mengurangi penggunaan energi minimum 35% dibandingkan lini hidraulik konvensional, dan udara bertahap menghindari menjalankan semuanya pada tekanan maksimum.

Kualitas udara bertekanan apa yang diperlukan untuk molding tiup?

Untuk botol makanan, farmasi, dan kosmetik, udara harus bebas minyak dan dikeringkan hingga kelas kebersihan yang selaras dengan konsep ISO 8573-1. Udara bersih melindungi keamanan produk dan menjaga katup bebas dari penumpukan minyak yang dapat mengganggu stabilitas tekanan.

Kesimpulan

Blow pressure is not one number but a two-stage system of preblow and final blow, shaped by material, temperature, timing, and bottle geometry. The material table, shape-correction rules, tuning flow, and defect card in this guide give you a repeatable method to find the minimum pressure that delivers full cavity contact and a sound bottle. Aibim, a Wanplas factory, builds IBM75, IBM65, and IBM55 Hybrid machines with PREFILL technology, staged air, and SD-card recipe storage that make this method easy to apply and transfer across lines.

If you are qualifying a new material or bottle, send us your material grade and bottle drawing. We will prepare a material-specific pressure process package and a machine configuration suggestion, and we welcome you to send samples for trial molding and to visit our factory for machine inspection and test runs. Our team will help you lock in a verified, energy-efficient pressure recipe before you scale production.